The study to select the optimum scheme conducted in previous section concludes that the scheme which consist of the dam at the vicinity of Keng Seuaten and the powerhouse at downstream of Keng Luang is the most optimum scheme for the project. The study continues with the steps of optimization for the key project components including dam height, the size of power waterway and installed capacity.