During the implementation of the temporary underdrain scheme, the following tasks should be performed:
• Determine the appropriate freeboard clearance beneath pavement structure
• Determine the possible methods of reducing the amount of infiltration in the grassing zones
• Determine the possible permanent solutions of controlling the water level in the subgrade sand beneath the pavement
• Implement the trial permanent subsurface drainage scheme