The negative cost measures are almost wholly to do with operational practices, the sole exception being light-weighting of existing aircraft (using lighter weight materials in upgrades or retrofitting).
The negative cost measures are almost wholly to do with operational practices, the sole exception being light-weighting ofexisting aircraft (using lighter weight materials in upgrades or retrofitting).