Dear Ms Kornkamol
There shall not be any grouting layer. The blow tank have to be placed on the foundation with foundation bolts in the holes.
Then fill up the foundation bolt holes with concrete.
We can check the SCL that foundation bolt drawing so it matches to the Valmet foundation drawing
Best Regards,