• Slightly lower task expertise (because they have broader responsibilities for the design and construction process, and typically less field experience), • Same level of safety expertise (unless their contracts with the owners explicitly absolve them of safety responsibilities), • Slightly lower site presence (because prime contractors are expected to run their portions of the project without oversight), • Same level of worker interaction and control (because they interact with the prime contractors’ foremen), and • Same level of site control.