The result of the high price case suggests that the requirement of additional power capacities by 2025 would
be 45,480 MW. This includes 45700 MW of gas fired, 14700 MW of coal fired, and 19220 MW of diesel power plants. The configuration of these additional capacities in each year is presented in Table 5.