In machinery spaces the emergency bilge suction
required by 4.1.5 and 5.1.4 is to be led to the largest available
power pump, which is not a bilge, propulsion or oil pump,
from a suitable low level in the machinery space and is to be
fitted with a screw-down non-return valve with an extended
spindle and hand wheel situated above the floor plating