We attended the premises on 14 May 2014 and met K. Surntaree Chaonimit, the Insured's Refrigeration Storage Manager to obtained the following information.
On 5 May 2014 at approximately 12.00 hrs., He was notified by K. Thanatorn, the Insured Process Engineer, found rust on refrigerant steel pipes in the production line. So he went to the storage outside behind the building to inspect with quality control staffs, this storage area had canopy and one side of the wall is closed with canvas. He advised us that a few days before there were heavy rainfall and gusty wind at the vicinity of the premises and they found trapped water on the storage area. Therefore we assume that possibly the rainwater ingressed to the storage area and damaged to the stocks.