The procedure for normal starting-up from 115kV power grid are the same as that described in section 4.1 In normal Starting-up mode the 115 kV Tie Circuit breaker for twin plant will be switched as follows
The procedure for normal starting-up from 115kV power grid are the same as thatdescribed in section 4.1In normal Starting-up mode the 115 kV Tie Circuit breaker for twin plant will beswitched as follows