lists the highest temperature rise, the reduction in the
temperature rise compared to the control concrete, and the time
of the highest temperature rise after casting of concrete. The control
concrete with a cement content of 350 kg/m3 had a highest
temperature rise of 30 C after mixing for 13 h. For 35BA10,
35BA20, and 35BA30 concretes, the highest temperature rises were
26, 23, and 20 C, respectively. The relationship between the temperature
rise of the concretes containing ground bagasse ash and
the time after casting is shown in Fig. 8.