Production process
1. Material are mixing between PET virgin and PET regrind 50:50 (Approx. BD. = 0.39 kg/l) and some time they use 100% regrind.
2. Through dryers
They would like to use 3 phase vacuum hopper loader for conveying of material mixing from 500 kg. bags to their extruder.
vertical = 4-5 M. horizontal = 5 M.
They need cyclone with filter also.