In some cases pilot projects and their location are selected for political reasons, without the needed local education, without trained local service personnel, and without consideration of the renewable energy resources. Field training and systematic follow-up to the system usage and operation would yield far greater rewards than the feel-good articles in local and international publications of a system that fails in two years or is simply unused due to failures that could be easily orrected by better trained local service personnel.