At the end of 2001, the Die Bahn Netz rail inspection train was equipped with a ‘production-model’ eddy-current detection unit. This unit, which will contain four eddy-current transducers for each rail, will enable the gauge corner and a large part of the running surface to be examined at inspection speeds of up to 100 km/h.