Given K, m and v, equation (16) is directly B*(Y). Just as we did with the two nodes system,
the conditional cost function is obtained calculating expenses per vehicle-hour times B*,
and adding loading/unloading sites expenses plus the right-of-way cost. Doing this and
after some re-ordering, we get