The RTSRA method was broadly applied to the safety management of a single concrete poured on the Xiluodu dam hydropower construction site.
Further study, however, is necessary to focus on case statistics and optimization of the HMM parameters concerned in improving the accuracy and effectiveness of the safety risk assessment method proposed.