If a company uses predetermined overhead rates, actual manufacturing overhead costs of a period will be recorded in the Manufacturing Overhead account, but they will not be recorded on the job cost sheets for the period.
3. In a job-order cost system, indirect labor is assigned to a job by using the labor time ticket as a source document.