Referring to GMTh/BSC team supplier improvement plan / Cost reduction for Y2014.
We’d like to appoint to conduct Elimination of the 7 Forms of Waste (COMMWIP) activity (Work shop) in order to improved productivity and find proposal to support cost reduction as content below;
Content
Introductions
7 Wastes of acknowledge
Problem Identification and Root Cause Analysis, Shop floor
Solution generation, evaluation and recommendation selection, Shop floor
Recommendation strengthening, stretching, and action
Repeat Steps 3-5 for the next problem