5. Reporting
The Operating and Maintenance Reports shall include the following information:
a) Daily operational monitoring report.
b) Weekly, Monthly and Annual reports regarding the following:
- The performance of the Plant.
- Overall solar radiation on the plane of the modules.
- The inverter stoppage periods.
- Summary of inspections, repairs, maintenance and replacement of parts with regards to the plant.
- Management and maintenance activities of the plant.
6. Boundaries
The boundaries for the operation and maintenance services are assumed to be the normal boundaries of the Power Plant. The details of the boundaries are :
Power Output to PEA Grid; Connection point at 115 kV line between Facility and PEA at front of fence of Facility
7. Owner’s Responsibilities
The Owner shall
1. Provide adequate and timely information regarding Facility design and the Owner’s requirements in order to allow the Contractor to adequately begin staffing the Facility to perform the work scope.
2. Provide, perform, and/or ensure the availability of, in a timely manner, as required to support the Operation and Maintenance of Facility, the following:
2.1 A copy of each project document to Contactor prior to Mobilization;
5. ReportingThe Operating and Maintenance Reports shall include the following information:a) Daily operational monitoring report.b) Weekly, Monthly and Annual reports regarding the following: - The performance of the Plant. - Overall solar radiation on the plane of the modules. - The inverter stoppage periods. - Summary of inspections, repairs, maintenance and replacement of parts with regards to the plant. - Management and maintenance activities of the plant.6. BoundariesThe boundaries for the operation and maintenance services are assumed to be the normal boundaries of the Power Plant. The details of the boundaries are : Power Output to PEA Grid; Connection point at 115 kV line between Facility and PEA at front of fence of Facility7. Owner’s ResponsibilitiesThe Owner shall1. Provide adequate and timely information regarding Facility design and the Owner’s requirements in order to allow the Contractor to adequately begin staffing the Facility to perform the work scope.2. Provide, perform, and/or ensure the availability of, in a timely manner, as required to support the Operation and Maintenance of Facility, the following: 2.1 A copy of each project document to Contactor prior to Mobilization;