SCOPE
1.1 All Project Specifications are intended to compliment the applicable Industry Standards and Codes. If there is any perceived conflict, the SUPPLIER is Department for resolution prior to execution of work or any commitment of the funds. The SUPPLIER is responsible for their work and deliverables meeting all requirements of Project Standards, Specifications, National Codes and Standards and any other Standards and Specifications provided to the SUPPLIER, unless the PURCHASER issues written documentation of the exception prior to any commitment.
1.2 The SUPPLIER shall comply with local codes, rules and regulations per L2CC000-00-EN-0032 / SLCP-00-19 Codes and Standards. Any conflict between these standards and codes and the local, governmental regulations shall be brought to the attention of the Company. This specification includes paint requirements, surface preparation, and application procedures for coating piping, equipment and structures.
1.3 TERMS AND DEFINITIONS
COMPANY Sasol Chemicals (USA) LLC / Sasol Energy (USA) LLC PURCHASER The COMPANY, or an Engineering Contractor acting as the authorized representative for the COMPANY that issues the purchase order and specifications to the SUPPLIER SUPPLIER The manufacturer of the equipment or the manufacturers agent MANUFACTURER Coatings system supplier