After about 12 months, one TDR probe (15 cm length) was
vertically inserted within each cylinder in order to continuously
monitor the soil water content. The probe signals were checked by
TDR-100 (Campbell Sci. Shepshed, UK) and stored every hour in a
CR1000 data logger.