Nakagawa san
I just want to inform you.
-Tomorrow i have to go to BS. Site again because today i checking with Jo san and Boy san they want United make the small slope between end of V-gutter and end of pavement. (Because it's difference level)
- For the pipe (make a cap) we can't install because they want to see the drawing first. They said they want to have water in and water out. We will have to install two-way pipe. And i already asked Noppadol san to draw it. After they approve we can go to install it again.
- Crack sealing already finished. From contract is 240 m. But now TSS made it 300 m. is maximum. (If we want more, they said that we should ask Sanit san)
After install pipe finish Jo san told me that you and me have to come to inspection for all those things with them.