The NASB issued the following recommendations as a result of its investigation:
• "Redesign the B-747 pylon structure, including attachment to engine and wing. All SBs and ADs should be terminated after the redesign;
• "The redesign program for the pylon should include a full-scale fatigue and fail-safe test; Source: Netherlands Aviation Safety Board