6-meter lengths of steel sheet piles shall be driven in a parallel direction of the road until the steel sheet piles are completely driven, with the exception of both start-end sides which shall be used for the access of the heavy equipment.
5.3 Following completion, the working area shall be arranged at least 6-7 meters in width.