Dear K.Kampol,
I would like to get quotation for Layout change for Chamfering 1-4.
Step of work :
1. Move Chamfering machine no.4 to new position. (Use old facility, only re-move and install by use old part, addition flex 1 inch = 3M and connection)
2. Install partition.(Partition is 1.0x2.0M (WxH) by Omega sheet H=1.2M and glass H=0.8M)
If you need more detail, please come to see me at actual place.
Thank you