BASE CONDITIONS
The base conditions under which the full capacity of a multilane highway segment is achieved include good weather, good visibility, no incidents or accidents, no work zone activity, and no pavement defects that would affect operations. This chapter's methodology assumes that these conditions exist. If any of these conditions do not exist, the speed, LOS, and capacity of the multilane highway segment can be expected to be worse than the predictions by this methodology.