The camp site for use by the contractor could be located somewhere alongside with the access to the dam site. It is envisaged that a location proposed for permanent camp during project operation as shown in the conceptual drawings could be used for this purpose. The electricity for use at the camp site and other construction equipments such as batching plant, crushing plant can be procured through a connection with the transmission line runing alongside road no. 8.