Once our suggestions were implemented, the second measurement series was conducted to evaluate
the subsequent reductions on the total OP time. The results and the differences between the first and the
second measurements are presented on the Table 1. The total time to complete the picking cycle is now
2.86 min/m , thus a reduction of nearly 50% was achieved.