1. Documents for execution
1.1 Location of consumers Rev.
1.2 Cable list Rev.
1.3 Connection drawings Rev.
CHECK
No. DESCRIPTION OF CHECK
RESULT
REMARKS
OK NOT OK N/A
2. General Checks
2.1 Panel Board, CB and cable labels are installed.
2.2 Panel board is installed in sufficient space for operating
2.3 Branch circuit breaker and cable are suitable size each other.
2.4 Panel board connected to earth grid.(Cable size__4_mm.)
2.5 All cable entries are properly glanded and sealed.
2.6 All cable connections in PB are properly made and secured.
2.7 Door is grounded
2.8 Internal cleanliness and External condition of Panel
2.9 Bonding between Ground bar and Neutron bar(MDB/DB)
2.10 Separation between Ground bar and Neutron cable(PB)
2.11 Ground cable for distribution load of CB
REMARK : No main CB in Panel board
:
:
: