Preparation of the area to work.
Removing and dismantle the pipe.
Dismantling the ceiling above the entrance to the factory.
PREPARATION OF THE AREA TO WORK.
1. REMOVING AND DISMANTLE THE PIPE.
2. DISMANTLING THE CEILING ABOVE THE ENTRANCE TO THE FACTORY.