A case study of the proposed model in Hong Kong is shown in Section 4. In this case, the first approach is used to identify the number of truck needed between two points and the total number of trucks in the entire system. Decisions about building an incinerator and a replacement truck warehouse with the minimal cost objectives are also discussed.