Dear Khun Ann,
On basis of this three month look ahead and your discussions with the STECON, the CC2500-1 that is needed for the five month CTCI project starting 1st of February will not be released until the end of end of February.
As a contingency option, please check with STECON if our LR1400/1 can execute the CC2500-1 lifts on STECON from 15th of January onwards to allow it to be released on time to get to Thai Oil site, ready to lift on the 1st of February.
I understand that Silamas need the LR1400/1 to work in North BKK now; however, we can release our CKE4000C (working as 250te cc) from STP&I for that job and replace with Thai ENC’s 300te cc. This needs to be checked for feasibility as well.
Thanks,
Vadim
Dear Khun Ann,
On basis of this three month look ahead and your discussions with the STECON, the CC2500-1 that is needed for the five month CTCI project starting 1st of February will not be released until the end of end of February.
As a contingency option, please check with STECON if our LR1400/1 can execute the CC2500-1 lifts on STECON from 15th of January onwards to allow it to be released on time to get to Thai Oil site, ready to lift on the 1st of February.
I understand that Silamas need the LR1400/1 to work in North BKK now; however, we can release our CKE4000C (working as 250te cc) from STP&I for that job and replace with Thai ENC’s 300te cc. This needs to be checked for feasibility as well.
Thanks,
Vadim