3.2 Centre line locations are correct
3.3 Protusion from base is correct
3.4 Threaded ends are protected
3.5 Cast in ducts; conduits are installed correctly
3.6 Ducts or conduits ends are capped
3.7 Blockouts are installed correctly
3.8 Blockout sizes are correct
3.9 Earthing cable is installed