This is my impression so far of what we can do with the existing runway structure pending clarification but it ought to be some variation on this. Basically should handle around 10T gross per section so about 7T (or 5T + 2T), and then there should not be any other heavy loads adjacent to this. So more cranes can be added but the distances have to be observed, requires safety protocols for this.