The technical potential of the arrangement of the
watercourses in the basin is of 47 EHP (Electrical Hydro Plant)
(2210 GWh/a) which corresponds to a level of utilization of the
theoretical potential of about 70%. Currently, the degree of
utilization of the technical potential is 16.8% [11]. The derived
numbers are calculated in [11].