The temperature for injection and FID was 350 C. The temperature of the column was initially maintained at 80 C for 5 min. Following this, the temperature was increased to 380 C at the rate of 15 C/min and kept on 380 C for 5 min. The conversion of transesterification occurred based on the following equation