Departments receiving N / C can take corrective action to prevent a maximum not over period of schedule. If the corrective Inspectors have verified ineffective and determine person in charge corrective action must to corrective and preventive actions and a second time by the inspectors to the N / C edition and he checked again the scheduled time.