With respect to the nature of these SHPPs, the costs of renovation and reconstruction of equipment at year 25 is taken to be approximately equal to the total value of equipment at time of purchase. To estimate the costs for large and medium sized power plants, the percentage of wear should be determined for different sections separately so that the calculation of these costs can be done in a more precise way