Waiting time
Hourly equipment rental fee for detaining equipment beyond the agreed free time for live loading
for unloading. The date and time for arrival and departure is to be noted on the shipping
document and signed by driver and sender, and/or receiver before being sent as attachment to
the "Non Conformity Advice".
Demurrage/ Terminal Rent
Equipment rental fee for detaining container at a container yard for longer period than provided
in rate as described in the relevant Sub-Agreement. The date and time for "gate in" and "gate
out" is to be noted on the shipping document before being sent to IKEA as attachment to the
"Non Conformity Advice".