we use ten times the diameter of the blades when a turbine is installed downstream of another, and five times the diameter when installed alongside (see stage 2 of the method).
we use ten times the diameter of the blades when a turbine is installed downstream of another, and five times the diameter when installed alongside (see stage 2 of themethod).