Wastewater from the second constructed wetland of the Hat Yai Municipality Central Wastewater Treatment Plant was introduced to the experiment using peristaltic pumps to operate and maintain a fixed flow rate.
Wastewater from the second constructed wetland of the Hat Yai Municipality Central Wastewater Treatment Plant was introduced to the experiment using peristaltic pumps to operate and maintain a fixed flow rate.