In addition, most of these studies have evaluated
nutrient removal in batch culture experiments lasting
several days, which is consistent with the stabilization
and high rate pond systems suggested by Oswald
(1988) but not with the short residence times of wastewater
in primary and secondary city treatment plants
(De la Notie et al., 1992) where space is at a premium.