The UF part of the process consisted of two low-pressure sub-merged pumps, one for the delivery of wastewater to a UF feed tank storage and one for the circulation of concentrate back from the UF feed tank to the settling basin. A high pressure pump was used for feeding the UF membrane. A 5 µm pre-filter was used to remove