It always becomes very indebted.
We will report the updated information this matter.
- Date = 2016/05/17
- The equipment = router Unit 3 (Z-axis with automatic adjustment function)
- Cause = outage due to the failure of equipment PC
·Correspondence
2016/05/17 = fault location investigation
2016/05/17 = repair arrangements in Thailand, Thailand other companies, spare existence investigation to our Kyoto headquarters
※ Thailand other companies, Kyoto headquarters spares arrange adjustment for spare is not to (2 weeks delivery time)
2016/05/18 = (repair status) Repair start (condenser replacement, exchange, such as a CPU board)
2016/05/19 = (repair status) ⇓
2016/05/20 = (repair status) arrange adjusted by the repair parts shortage
2016/05/21 = (repair status) lack of parts waiting
2016/05/22 = (repair status) lack of parts availability, repair Resume
2016/05/23 = (repair status) repair parts built-in scheduled to be completed, the morning in the PC start-up adjustment
You're welcome with the current situation, the equipment than today afternoon in the shortest (Unit 3 router) is restored
Production of DV2 sequence DV4 both products is becoming expected to be resumed.
Then, measure the catch-up of the restoration as soon as maximum production, to develop a once production status
I will contact you again today.
Deeply apologize repeatedly that I will apologize for the inconvenience.