Feasibility Study
There are 5 feasibility studies, Technical, Economic, Legal, Operational and Scheduling
Technical
- In order to places the concrete pillar, we need concrete pillar, which can be create and made anywhere. The concrete pillar use block as a sample for concrete, so there are no problems to make in different factory. Villager even can make their own if there have enough material. After finishing the concrete, transportation is not much problem, except the setting process of the pillar. That need large boat and tools to lift up concrete pillar and places on the sand.