Comletion of preliminary design. The PM should prepare a prelliminary design cost estimate based on measurement of approximate or parameter quantities from the designer's preliminary design submittal. As the mechanical and electrical designs typically lag behind the civil archilectural and structural designs preliminary design estimates often contain approximate quantities for the architectural structural and civil works and parameter quantities for the mechanical and electrical components.