2) If the process is in the in-control state and the frequency
of the requirement changes are stable, the frequency of the
requirement changes can be seen as a normally distributed
random variable. And it can also be seen as a baseline of the
new projects. Otherwise, if the process is out-of-control, the
process should be diagnosed to confirm the root causes and
to take actions to eliminate the unusable events.