Without limiting the generality of the foregoing, all Owner’s Engineer Personnel employed by the Owner’s Engineer for the provision of the Services and the Additional Services will be of such number, qualifications, training, experience and competence as will enable the Owner’s Engineer to perform the Services for the duration of the Term and the Additional Services during the period within which such Additional Services are performed. The organization of the Owner’s Engineer Personnel shall be as provided in Schedule C, as the same may be amended or reivised upon due consultation between the Owner and the Owner’s Engineer.”