In total, six (6) boreholes at various depths were drilled at the dam, intake structure, surge shaft, and power house to investigate the foundation properties of those structures. At the quarry, one (1) borehole was drilled to investigate the construction material properties. The total depth of the boreholes was 410 m, and the maximum depth of borehole SSH1 at the surge shaft was 80 meters.