Related conditions in the field did not allow for the existence of the Manhole work in the upper Cluster Scarlet area so that there was a Clean out installation in the upper Cluster of Scarlet (position and Detail attached). The condition is due to colliding between Manhole, RCP, Pile Cap Housing
การแปล กรุณารอสักครู่..
