Detailed fabrication/erection drawings of steel towers provided by EGAT will be furnished to the Contractor after Award of the Contract. The full responsibility for adequacy of all detailed drawings shall rest with the Contractor and he shall have no right to claim for additional compensation as a result of his mininterpretation or failure to check the drawings for compliance with rhe design requirements, inaccuracies, errors and omissions.